
Summary Power
Total Power Output from all Sources
Wind Turbine
2.73
kW
Solar Panel
7.23
kW
Grid
0
kW
Total Usage
2.73
kW
See full report
Alerts (5)
View All
Critical
Inverter - 12 (#32 Kantor Pertamina Bandung)
Offline 3 days ago
Critical
Battery - 00121 (#32 Kantor Pertamina Bandung)
HOC 77%
High
Battery - 00221 (#32 Kantor Pertamina Bandung)
HOC 85%
Statistic
54
Location
2422
Solar Panel
21
Wind Turbine
1219
Sun Tracking
8131
Battery
Location List
View All
Normal
#12 Kantor Pertamina Pusat
Jl. Medan Merdeka Tim. No.1A 2, RT.2/RW.1, Gambir, Kecamatan Gambir, Kota Jakarta Pusat, Daerah Khusus Ibukota Jakarta 10110
Solar Intensity
0.85 kW/m²
Wind Speed
1.2 (m/s)
Overview
Total Consumption
5.000 kWh
Solar Production
18.000 kWh
Wind Production
0 kWh
Grid
0 kWh
Device
Solar Panel
12 pcs
Wind Turbine
0
Sun Tracking System
2 Pcs
Battery Storage
12 pcs
Normal
#23 Kantor Pertamina Bandung
Jl. Medan Merdeka Tim. No.1A 2, RT.2/RW.1, Gambir, Kecamatan Gambir, Kota Jakarta Pusat, Daerah Khusus Ibukota Jakarta 10110

Solar Intensity
0.85 kW/m²

Wind Speed
1.2 (m/s)
Overview
Total Consumption
5.000 kWh
Solar Production
18.000 kWh
Wind Production
0 kWh
Consumption from PLN
0 kWh
Device
Solar Panel
12 pcs
Wind Turbine
0
Sun Tracking System
2 Pcs
Battery Storage
12 pcs
Normal
#32 Kantor Pertamina Bandung
Jl. Medan Merdeka Tim. No.1A 2, RT.2/RW.1, Gambir, Kecamatan Gambir, Kota Jakarta Pusat, Daerah Khusus Ibukota Jakarta 10110

Intensitas Solar
0.85 kW/m²

Kecepatan Angin
1.2 (m/s)
Overview
Total Konsumsi
5.000 kWh
Produksi Solar
18.000 kWh
Produksi Wind
0 kWh
Konsumsi dari PLN
0 kWh
Device
Solar Panel
12 pcs
Wind Turbine
0
Sun Tracking System
2 Pcs
Battery Storage
12 pcs
09/09/2025 - 30/09/2025
Consumption
< 5 kWH
> 5 kWH
> 10 kWH
> 30 kWH
00.00
02.00
04.00
06.00
08.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Usage
Total Usage
220
kWH
Production
2.73
kW
Wind Turbine
2.73
kW
Solar Panel
2.73
kW
Grid
0
kW