Solar Power for Manufacturing Plant
Implementation of a large-scale solar and battery storage solution for a factory, lowering operational costs and ensuring 24/7 electricity reliability.
Overview
In June 2025, Exaditama successfully completed the installation of a solar panel system at PT Tanobel, marking a significant step toward reducing dependency on conventional electricity and supporting the company’s sustainability initiatives.
Project Background
PT Tanobel, a leading player in the beverage industry, has been committed to reducing its carbon footprint. To align with its green initiatives, the company partnered with Exaditama to integrate renewable energy solutions that ensure long-term efficiency and cost savings.
Scope of Work
Design and installation of solar PV system
Integration with existing electricity infrastructure
Smart monitoring system deployment for real-time tracking
Maintenance and technical support
Specifications
Installed Capacity: 500 kWp
Solar Modules: 920 units of 545 Wp panels
Inverter: 4 units string inverter (125 kW each)
Expected Energy Output: ± 650,000 kWh annually
CO₂ Reduction: ± 480 tons per year
Project Impact
The system is projected to cover up to 35% of PT Tanobel’s daytime electricity consumption, significantly reducing energy costs and lowering environmental impact. This project reflects Exaditama’s commitment to delivering reliable renewable solutions for industrial clients.